Image from Google Jackets

Applying the earned value management [evm] technique as an effective tool for monitoring and controlling construction project performance / Mohamed Ahmed Sameh Negida.

By: Contributor(s): Material type: TextPublication details: 2015.Description: 72 p. : ill. (col.) ; 28 cmSubject(s): Genre/Form: Issued with: DDC classification:
  • 22 624 NEG
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
Projects - Students (NB) Central Library Second Floor 624 NEG (Browse shelf(Opens below)) Not for loan 000046707
Total holds: 0

A dissertation submitted to the Faculty of engineering, the British University in Egypt, in partial fulfillment of the requirements for the bachelor degree in civil engineering.

manar

There are no comments on this title.

to post a comment.